Validate / CPSC eFiling date format converter
CPSC eFiling date format converter
Manufacture Date is a month and year. Last Test Date and the production dates are full dates. Type a date as you have it.
| Template V3 column | Format | Example |
|---|---|---|
| Manufacture Date | MM/CCYY | 06/2026 |
| Last Test Date | MM/DD/CCYY | 06/20/2026 |
| Production Start Date | MM/DD/CCYY | 06/01/2026 |
| Production End Date | MM/DD/CCYY | 06/14/2026 |
Source: Field Details, CPSC User Guide for CSV Upload V3 (December 2025). CC is the century: CCYY is the four-digit year.
What common spellings turn into
| As typed | Manufacture Date (MM/CCYY) | Last Test Date (MM/DD/CCYY) |
|---|---|---|
| 2026-06-20 | 06/2026 | 06/20/2026 |
| 6/20/2026 | 06/2026 | 06/20/2026 |
| 06/20/2026 | 06/2026 | 06/20/2026 |
| 20/06/2026 | Refused: "20/06/2026" is not a month and year. | Refused: "20/06/2026" reads as day/month/year. |
| 03/08/26 | Refused: "03/08/26" is not a month and year. | Refused: "03/08/26" has a two-digit year. |
| Jun 2026 | 06/2026 | Refused: "Jun 2026" is not a date. |
| 2026-06 | 06/2026 | Refused: "2026-06" is not a date. |
| 06/2026 | 06/2026 | Refused: "06/2026" is not a date. |
| 45828 | Refused: "45828" is not a month and year. | Refused: "45828" looks like an Excel date number, not a date. |
- A day-first date such as 20/06/2026 is refused, not swapped, when it cannot be a month-first date. 03/04/2026 is read month-first: check dates copied from factory paperwork.
- 45828 is how Excel stores a date internally. Format the column as Text before typing.
- The converter is the same code the file validator runs on every row. Reading 2026-06-20 or Jun 2026 is this site's convenience; CPSC's guide names only the two formats above.
Questions
What date format does CPSC eFiling use for Manufacture Date?
MM/CCYY, the month and four-digit year, for example 06/2026. CPSC's CSV guide describes it as the month and year the product was manufactured.
What date format does Last Test Date use in the CPSC eFiling CSV?
MM/DD/CCYY, for example 06/20/2026. Production Start Date and Production End Date use the same format.